VERTEXProject Consultants

EPCM project management · Medellín, Colombia

From blueprintto commissioning.

We manage Oil & Gas, Mining, Energy and Infrastructure projects with one accountable lead from engineering to handover. 37 years on site taught us where schedules and budgets get lost.

37+years in industrial construction
04high-complexity industries
EPCMone accountable lead, end to end
CO · USteams and clients in Spanish and English
Our team has worked with37 years on site alongside world leaders in engineering and mining
  • Fluor DanielInternational EPC
  • JGCEPC · Japan
  • Mota-EngilConstruction & infrastructure
  • Barrick GoldGold mining
  • Gran ColombiaGold mining · Colombia
02 — Industries

Where safety, quality, schedule, and cost are the benchmark of our services

Oil & Gas

01
H = 42 mØ 22 m6"-HC-1001C-101TK-201RACK R-01

Process plants, pipelines and facilities where one interface error costs weeks.

See scope

Mining

02
α = 32°SHEAVE Ø 4.5 mHEADFRAMECV-02STOCKPILE

Plants, mine infrastructure and expansions at remote sites, without stopping operations.

See scope

Energy

03
f = 4.2 m115 kVTOWER T-14TR-01 115/34.5 kVTOWER T-15

From civil works to energization: substations, lines and power plants.

See scope

Infrastructure

04
H = 2.8 mØ 900 mmCROWN 2 %1.60 mDITCHMANHOLE MH-03S = 1.5 %

The civil works nobody sees but everything relies on: drainage, sewers, roads and networks.

See scope
03 — Method

Five stages, the same person in charge

Field experience from assessment to handover, with no layers between you and the site.

01

Assessment

Scope, risks and the real state of the project, checked on site.

02

Planning

Execution strategy, schedule, budget and contracting plan.

03

Execution & control

Progress, cost, quality and HSE, reported weekly to the owner.

04

Commissioning

Testing, start-up and commissioning alongside the operator.

05

Close-out

Dossier, as-built drawings and lessons learned.

Is your project still being defined or already on site?

Tell us the scope and the stage. Eng. Danilo Taborda replies personally within one business day.

Let's discuss your project